Geronimo Power owns Crocker Wind Farm from 2025.
claim · revision 1 · immutable k_b698a0d762d20cb28e090f09fb7622f5 · asserted · current · positive · confidence 0.95 tier_default/v1 · mirror of k_d50de1569c6d
| subject | geronimo-power |
|---|---|
| predicate | owns |
| object / value | Crocker Wind Farm place entity |
| valid time | 2025 → open current |
| asserted / retrieved | 2026-11-24T00:00:00Z / 2026-11-23T19:24:05Z |
| revisions | @1 2026-11-24 |
Evidence
60505,Crocker Wind Farm,62759,Geronimo Power,Conde,SD,Clark,45.051544,-97.826423000000005,MRO,MISO,"Midcontinent Independent Transmission System Operator, Inc..",IPP Non-CHP,200.0,Onshore Wind Turbine,Onshore Wind Turbine,S
retrieved 2026-11-23T19:24:05Z · capture ev/f1d862356710 · line:4071 · rights: public-record (EIA-860 Annual Electric Generator Report (public domain, U.S. Government)) display yes · export yes · train yes