[
  {
    "id": "k_af6fe87c9e52a9b1d0d62a4aeca609dc",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "identifier",
    "object": null,
    "value": {
      "scheme": "eia_plant_id",
      "value": "1203"
    },
    "datatype": "identifier",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_f2fdb05a819c69e201351c8868dd916d",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "instance_of",
    "object": {
      "id": "power-station",
      "label": "power station",
      "type": "concept"
    },
    "value": null,
    "datatype": "entity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_e5f653f98c5012859f79198ad9892e8f",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "instance_of",
    "object": {
      "id": "oil-fired-power-station",
      "label": "oil-fired power station",
      "type": "concept"
    },
    "value": null,
    "datatype": "entity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_39ab9e5f21510df3444c71c351070da8",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "generating_capacity",
    "object": null,
    "value": {
      "amount": 17.6,
      "unit": "MW"
    },
    "datatype": "quantity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "current",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": "2025",
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_8a6c3e775b5b52d445f18c3a20a3eea3",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "located_in",
    "object": {
      "id": "madison-county-iowa",
      "label": "Madison County, Iowa",
      "type": "place"
    },
    "value": null,
    "datatype": "entity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_833dc42fdbc29992424e40b79db916a5",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "coordinates",
    "object": null,
    "value": {
      "lat": 41.3372,
      "lon": -94.0126
    },
    "datatype": "geo",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_893460c8ed1950d2be8ed2a8c955c58e",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "operator",
    "object": {
      "id": "city-of-winterset-ia",
      "label": "City of Winterset - (IA)",
      "type": "organization"
    },
    "value": null,
    "datatype": "entity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "unknown",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": null,
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  },
  {
    "id": "k_d97c4d405da98f17384fd5d10387d401",
    "revision": 1,
    "subject": "winterset-oil-fired-power-station",
    "predicate": "owned_by",
    "object": {
      "id": "city-of-winterset-ia",
      "label": "City of Winterset - (IA)",
      "type": "organization"
    },
    "value": null,
    "datatype": "entity",
    "polarity": "positive",
    "epistemic": "asserted",
    "temporal": "current",
    "status": "current",
    "confidence": 0.95,
    "confidence_method": "tier_default/v1",
    "valid_from": "2025",
    "valid_to": null,
    "asserted_at": "2026-11-24T00:36:00Z",
    "retrieved_at": "2026-11-23T19:24:05Z",
    "evidence": [
      {
        "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
        "capture": {
          "store": "ev",
          "sha256": "f1d86235671048eca1c2a3b099ce49078f3024ae6c8e5fdd3a837ebd586baa9e"
        },
        "retrieved_at": "2026-11-23T19:24:05Z",
        "published_at": null,
        "quote": "1203,Winterset,20835,City of Winterset - (IA),Winterset,IA,Madison,41.337200000000003,-94.012600000000006,MRO,MISO,\"Midcontinent Independent Transmission System Operator, Inc..\",Electric Utility,17.6,Petroleum Liquids,Petroleum Liquids; Natural Gas Internal Combustion Engine,S",
        "tier": "registry",
        "locator": "line:402",
        "media": null,
        "source_family": "eia",
        "method": "api",
        "extractor": {
          "name": "build_release",
          "version": "0.3.1"
        },
        "rights": {
          "holder": "EIA-860 Annual Electric Generator Report (public domain, U.S. Government)",
          "license": "public-record",
          "basis": "public_record",
          "display": true,
          "export": true,
          "train": true,
          "policy_version": "2026-10-20"
        }
      }
    ],
    "derived_from": [],
    "derivation": null,
    "qualifiers": {},
    "negation": null,
    "supersedes": null,
    "mirror_of": null
  }
]