[as of 2026-11-24] Trailside Solar Center has the identifier eia_plant_id 62916. [as of 2026-11-24] Trailside Solar Center is an instance of power station. [as of 2026-11-24] Trailside Solar Center is an instance of solar power station. [2025] Trailside Solar Center is owned by Florida Power & Light Co from 2025. [as of 2026-11-24] Trailside Solar Center is operated by Florida Power & Light Co. [2025] Trailside Solar Center had a generating capacity of 74.5 MW on 2025. [as of 2026-11-24] Trailside Solar Center is located in St. Johns County, Florida. [as of 2026-11-24] Trailside Solar Center is at 29.774987, -81.427853.