# Tieton Dam Hydro Electric Project

place · `tieton-dam-hydro-electric-project` · tier 1 · v1 · updated 2026-11-24

14 MW hydroelectric power station in Yakima County, Washington, operated by City of Burbank Water and Power - (CA)

## Identifiers
- eia_plant_id: 57496

## Facts
### Current
- Tieton Dam Hydro Electric Project is an instance of hydroelectric power station. (current, 0.95, registry) <https://entiti.tech/c/k_1db7d1a153f2e85ce1463b08e40ce5c1@1>
- Tieton Dam Hydro Electric Project is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_9ffcbd44badfabc913f735836a625518@1>
- Tieton Dam Hydro Electric Project is owned by Southern California P P A (100.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_ccc701a10ba2d7a622f209cfb28bd046@1>
- Tieton Dam Hydro Electric Project is operated by City of Burbank Water and Power - (CA). (current, 0.95, registry) <https://entiti.tech/c/k_91df9eea67aeaed1ac44d6f97a608269@1>
- Tieton Dam Hydro Electric Project had a generating capacity of 13.8 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_fc2c798015bdff05baa71477cf2ee28b@1>
- Tieton Dam Hydro Electric Project is located in Yakima County, Washington. (current, 0.95, registry) <https://entiti.tech/c/k_cc469260cfe1063f4d382ecbc96232d0@1>
- Tieton Dam Hydro Electric Project is at 46.658, -121.1287. (current, 0.95, registry) <https://entiti.tech/c/k_15e0cf2d2ad4f030a5202fb19ca3340e@1>

## Links
- JSON: /e/tieton-dam-hydro-electric-project.json · JSON-LD: /e/tieton-dam-hydro-electric-project.jsonld · Facts: /e/tieton-dam-hydro-electric-project.txt · Feed: /e/tieton-dam-hydro-electric-project/feed.xml · Graph: /e/tieton-dam-hydro-electric-project/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
