[as of 2026-11-24] Terminus Hydroelectric Project has the identifier eia_plant_id 54343. (current, 0.95, registry) [as of 2026-11-24] Terminus Hydroelectric Project is an instance of hydroelectric power station. (current, 0.95, registry) [as of 2026-11-24] Terminus Hydroelectric Project is an instance of power station. (current, 0.95, registry) [2025] Terminus Hydroelectric Project is owned by Terminus Hydroelectric, LLC (100.0%) from 2025. (current, 0.95, registry) [as of 2026-11-24] Terminus Hydroelectric Project is operated by Eagle Creek Renewable Energy, LLC. (current, 0.95, registry) [2025] Terminus Hydroelectric Project had a generating capacity of 20.1 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Terminus Hydroelectric Project is located in Tulare County, California. (current, 0.95, registry) [as of 2026-11-24] Terminus Hydroelectric Project is at 36.4156, -119.0069. (current, 0.95, registry)