# Stampede Solar Hybrid

place · `stampede-solar-hybrid` · tier 1 · v1 · updated 2026-11-24

328 MW solar power station in Hopkins County, Texas, operated by Stampede Solar Project LLC

## Identifiers
- eia_plant_id: 67762

## Facts
### Current
- Stampede Solar Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_6a70ce88ef24f969fdddb2c46c6e6076@1>
- Stampede Solar Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_32d3df9c042ea7ac9227f775ada64c92@1>
- Stampede Solar Hybrid is owned by Stampede Solar Project LLC from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_e6fd874121930511817a246a64390f3c@1>
- Stampede Solar Hybrid is operated by Stampede Solar Project LLC. (current, 0.95, registry) <https://entiti.tech/c/k_0d8ea32bfdedd1a646ff2983d3c28def@1>
- Stampede Solar Hybrid had a generating capacity of 328.1 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_f7cd9ff68347fc055c201478abeda88e@1>
- Stampede Solar Hybrid is located in Hopkins County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_c0ca837bbe2515be477f1b460fb8bb14@1>
- Stampede Solar Hybrid is at 33.201315, -95.319229. (current, 0.95, registry) <https://entiti.tech/c/k_397f50666ed9dbfcd4cf543261f247a0@1>

## Links
- JSON: /e/stampede-solar-hybrid.json · JSON-LD: /e/stampede-solar-hybrid.jsonld · Facts: /e/stampede-solar-hybrid.txt · Feed: /e/stampede-solar-hybrid/feed.xml · Graph: /e/stampede-solar-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
