[as of 2026-11-24] Silver Star I Wind Power Project has the identifier eia_plant_id 56771. [as of 2026-11-24] Silver Star I Wind Power Project is an instance of power station. [as of 2026-11-24] Silver Star I Wind Power Project is an instance of wind farm. [2025] Silver Star I Wind Power Project is owned by Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC (66.6%) from 2025. [2025] Silver Star I Wind Power Project is owned by UBS Asset Management (Americas) Inc (33.4%) from 2025. [as of 2026-11-24] Silver Star I Wind Power Project is operated by Silver Star I Power Partners LLC. [2025] Silver Star I Wind Power Project had a generating capacity of 52.8 MW on 2025. [as of 2026-11-24] Silver Star I Wind Power Project is located in Erath County, Texas. [as of 2026-11-24] Silver Star I Wind Power Project is at 32.338659, -98.476051.