[as of 2026-11-24] Separator (Etiwanda) BESS has the identifier eia_plant_id 65456. [as of 2026-11-24] Separator (Etiwanda) BESS is an instance of battery storage station. [as of 2026-11-24] Separator (Etiwanda) BESS is an instance of power station. [2025] Separator (Etiwanda) BESS is owned by SOUTHERN CALIFORNIA EDISON Co from 2025. [as of 2026-11-24] Separator (Etiwanda) BESS is operated by SOUTHERN CALIFORNIA EDISON Co. [2025] Separator (Etiwanda) BESS had a generating capacity of 112.5 MW on 2025. [as of 2026-11-24] Separator (Etiwanda) BESS is located in San Bernardino County, California. [as of 2026-11-24] Separator (Etiwanda) BESS is at 34.09211, -117.53402.