[as of 2026-11-24] Rosamond South 1 has the identifier eia_plant_id 67764. (current, 0.95, registry) [as of 2026-11-24] Rosamond South 1 is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Rosamond South 1 is an instance of solar power station. (current, 0.95, registry) [2025] Rosamond South 1 is owned by Golden Fields Solar IV, LLC from 2025. (current, 0.95, registry) [as of 2026-11-24] Rosamond South 1 is operated by Golden Fields Solar IV, LLC. (current, 0.95, registry) [2025] Rosamond South 1 had a generating capacity of 257.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Rosamond South 1 is located in Kern County, California. (current, 0.95, registry) [as of 2026-11-24] Rosamond South 1 is at 34.842496, -118.378491. (current, 0.95, registry)