[as of 2026-11-24] Roadrunner Reserve Phase 1 has the identifier eia_plant_id 67905. [as of 2026-11-24] Roadrunner Reserve Phase 1 is an instance of battery storage station. [as of 2026-11-24] Roadrunner Reserve Phase 1 is an instance of power station. [2025] Roadrunner Reserve Phase 1 is owned by Tucson Electric Power Co from 2025. [as of 2026-11-24] Roadrunner Reserve Phase 1 is operated by Tucson Electric Power Co. [2025] Roadrunner Reserve Phase 1 had a generating capacity of 200.0 MW on 2025. [as of 2026-11-24] Roadrunner Reserve Phase 1 is located in Pima County, Arizona. [as of 2026-11-24] Roadrunner Reserve Phase 1 is at 32.071759, -110.816193.