[as of 2026-11-24] Ridgeland Solar Project has the identifier eia_plant_id 60659. [as of 2026-11-24] Ridgeland Solar Project is an instance of power station. [as of 2026-11-24] Ridgeland Solar Project is an instance of solar power station. [2025] Ridgeland Solar Project is owned by Dominion Renewable Energy from 2025. [as of 2026-11-24] Ridgeland Solar Project is operated by Dominion Renewable Energy. [2025] Ridgeland Solar Project had a generating capacity of 10.0 MW on 2025. [as of 2026-11-24] Ridgeland Solar Project is located in Jasper County, South Carolina. [as of 2026-11-24] Ridgeland Solar Project is at 32.465, -80.961.