[as of 2026-11-24] Red Mesa Solar Project has the identifier eia_plant_id 66404. (current, 0.95, registry) [as of 2026-11-24] Red Mesa Solar Project is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Red Mesa Solar Project is an instance of solar power station. (current, 0.95, registry) [2025] Red Mesa Solar Project is owned by NTUA Generation - Utah, LLC from 2025. (current, 0.95, registry) [as of 2026-11-24] Red Mesa Solar Project is operated by NTUA Generation - Utah, LLC. (current, 0.95, registry) [2025] Red Mesa Solar Project had a generating capacity of 72.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Red Mesa Solar Project is located in San Juan County, Utah. (current, 0.95, registry) [as of 2026-11-24] Red Mesa Solar Project is at 37.120814, -109.411511. (current, 0.95, registry)