[as of 2026-11-24] Quinto Solar PV Project has the identifier eia_plant_id 59339. [as of 2026-11-24] Quinto Solar PV Project is an instance of power station. [as of 2026-11-24] Quinto Solar PV Project is an instance of solar power station. [2025] Quinto Solar PV Project is owned by Arevon Energy, Inc. from 2025. [as of 2026-11-24] Quinto Solar PV Project is operated by Arevon Energy, Inc.. [2025] Quinto Solar PV Project had a generating capacity of 108.0 MW on 2025. [as of 2026-11-24] Quinto Solar PV Project is located in Merced County, California. [as of 2026-11-24] Quinto Solar PV Project is at 37.130278, -121.052222.