[as of 2026-11-24] Quail Ranch Solar and BESS has the identifier eia_plant_id 67204. (current, 0.95, registry) [as of 2026-11-24] Quail Ranch Solar and BESS is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Quail Ranch Solar and BESS is an instance of solar power station. (current, 0.95, registry) [2025] Quail Ranch Solar and BESS is owned by Clenera LLC (100.0%) from 2025. (current, 0.95, registry) [as of 2026-11-24] Quail Ranch Solar and BESS is operated by Quail Ranch Solar and Battery Energy Storage System. (current, 0.95, registry) [2025] Quail Ranch Solar and BESS had a generating capacity of 100.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Quail Ranch Solar and BESS is located in Bernalillo County, New Mexico. (current, 0.95, registry) [as of 2026-11-24] Quail Ranch Solar and BESS is at 35.199081, -106.856608. (current, 0.95, registry)