[as of 2026-11-24] Post Wind Farm LP has the identifier eia_plant_id 56457. [as of 2026-11-24] Post Wind Farm LP is an instance of power station. [as of 2026-11-24] Post Wind Farm LP is an instance of wind farm. [2025] Post Wind Farm LP is owned by FPL Energy Red Canyon LLC from 2025. [as of 2026-11-24] Post Wind Farm LP is operated by FPL Energy Red Canyon LLC. [2025] Post Wind Farm LP had a generating capacity of 84.0 MW on 2025. [as of 2026-11-24] Post Wind Farm LP is located in Borden County, Texas. [as of 2026-11-24] Post Wind Farm LP is at 32.92544, -101.219397.