# Palouse (wind farm)

place · `palouse-wind-farm` · tier 1 · v1 · updated 2026-11-24

105 MW wind farm in Whitman County, Washington, operated by Onward Energy

## Identifiers
- eia_plant_id: 57530

## Facts
### Current
- Palouse (wind farm) is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_3ab020fb2581c2d0c26d8e5d5a0c8e8b@1>
- Palouse (wind farm) is an instance of wind farm. (current, 0.95, registry) <https://entiti.tech/c/k_bb2974d77f5f3b3fb1bba7226c9d4239@1>
- Palouse (wind farm) is owned by Onward Energy from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_df98e3d050d0847682e83870b87aa8cf@1>
- Palouse (wind farm) is operated by Onward Energy. (current, 0.95, registry) <https://entiti.tech/c/k_1e3792749c699d162393968ae402905e@1>
- Palouse (wind farm) had a generating capacity of 105.3 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_a7e8007b7c36ede842b286bb1eb0d3bf@1>
- Palouse (wind farm) is located in Whitman County, Washington. (current, 0.95, registry) <https://entiti.tech/c/k_035993b5358e5274fb566aef9983c7c6@1>
- Palouse (wind farm) is at 47.155833, -117.364444. (current, 0.95, registry) <https://entiti.tech/c/k_60db0d817903fdaa9bad2866acd77d6b@1>

## Links
- JSON: /e/palouse-wind-farm.json · JSON-LD: /e/palouse-wind-farm.jsonld · Facts: /e/palouse-wind-farm.txt · Feed: /e/palouse-wind-farm/feed.xml · Graph: /e/palouse-wind-farm/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
