# Palmer Solar

place · `palmer-solar` · tier 1 · v1 · updated 2026-11-24

60 MW solar power station in El Paso County, Colorado, operated by Deriva Energy

## Identifiers
- eia_plant_id: 62495

## Facts
### Current
- Palmer Solar is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_c871a042df5c68c20b939f1f5c9bdcd1@1>
- Palmer Solar is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_c5ce110c18f154edca5ac43710ff41b7@1>
- Palmer Solar is owned by Palmer Solar, LLC (100.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_5a3bda0c89e774095c6018ba587ebc97@1>
- Palmer Solar is operated by Deriva Energy. (current, 0.95, registry) <https://entiti.tech/c/k_d6d7644e862105736d91befa23acf275@1>
- Palmer Solar had a generating capacity of 60.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_ac4ba07a70d3bebde1a55fba4253ef86@1>
- Palmer Solar is located in El Paso County, Colorado. (current, 0.95, registry) <https://entiti.tech/c/k_a83d854f18c816abbfda289e48716b06@1>
- Palmer Solar is at 38.6299, -104.6526. (current, 0.95, registry) <https://entiti.tech/c/k_318dd07867b06884fb00bd0cc57595bf@1>

## Links
- JSON: /e/palmer-solar.json · JSON-LD: /e/palmer-solar.jsonld · Facts: /e/palmer-solar.txt · Feed: /e/palmer-solar/feed.xml · Graph: /e/palmer-solar/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
