[as of 2026-11-24] NWP Indian Mesa Wind Farm has the identifier eia_plant_id 55747. (current, 0.95, registry) [as of 2026-11-24] NWP Indian Mesa Wind Farm is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] NWP Indian Mesa Wind Farm is an instance of wind farm. (current, 0.95, registry) [2025] NWP Indian Mesa Wind Farm is owned by Florida Power & Light Co (100.0%) from 2025. (current, 0.95, registry) [as of 2026-11-24] NWP Indian Mesa Wind Farm is operated by NWP Indian Mesa Wind Farm LP. (current, 0.95, registry) [2025] NWP Indian Mesa Wind Farm had a generating capacity of 82.5 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] NWP Indian Mesa Wind Farm is located in Pecos County, Texas. (current, 0.95, registry) [as of 2026-11-24] NWP Indian Mesa Wind Farm is at 30.931467, -102.201433. (current, 0.95, registry)