# Notrees Windpower Hybrid

place · `notrees-windpower-hybrid` · tier 1 · v1 · updated 2026-11-24

188 MW wind farm in Ector County, Texas, operated by Deriva Energy

## Identifiers
- eia_plant_id: 56961

## Facts
### Current
- Notrees Windpower Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_c72591eb0e181416380499ace4256cc8@1>
- Notrees Windpower Hybrid is an instance of wind farm. (current, 0.95, registry) <https://entiti.tech/c/k_da55c43103fe3b8fe416c4e5e713814f@1>
- Notrees Windpower Hybrid is owned by DEGS Wind 1 LLC (99.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_e13f6cd4d048e7195b044cf29a056cd9@1>
- Notrees Windpower Hybrid is owned by TE Notrees LLC (1.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_ad1584e976d6677683fe0ca799c3a6db@1>
- Notrees Windpower Hybrid is operated by Deriva Energy. (current, 0.95, registry) <https://entiti.tech/c/k_a12de360b57f8ffcb18736d98503ef12@1>
- Notrees Windpower Hybrid had a generating capacity of 188.5 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_1946d9bc2b30dafdd7da0895909140ef@1>
- Notrees Windpower Hybrid is located in Ector County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_c56aeee1c3be0e1168740600b130ecf5@1>
- Notrees Windpower Hybrid is at 31.995, -102.828333. (current, 0.95, registry) <https://entiti.tech/c/k_db86e5011fca2ed2fcf344845166b72f@1>

## Links
- JSON: /e/notrees-windpower-hybrid.json · JSON-LD: /e/notrees-windpower-hybrid.jsonld · Facts: /e/notrees-windpower-hybrid.txt · Feed: /e/notrees-windpower-hybrid/feed.xml · Graph: /e/notrees-windpower-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
