[as of 2026-11-24] North English (wind farm) has the identifier eia_plant_id 62133. [as of 2026-11-24] North English (wind farm) is an instance of power station. [as of 2026-11-24] North English (wind farm) is an instance of wind farm. [2025] North English (wind farm) is owned by MidAmerican Energy Co from 2025. [as of 2026-11-24] North English (wind farm) is operated by MidAmerican Energy Co. [2025] North English (wind farm) had a generating capacity of 340.0 MW on 2025. [as of 2026-11-24] North English (wind farm) is located in Poweshiek County, Iowa. [as of 2026-11-24] North English (wind farm) is at 41.642776, -92.499064.