[as of 2026-11-24] McCoy Solar Energy Project Hybrid has the identifier eia_plant_id 58462. [as of 2026-11-24] McCoy Solar Energy Project Hybrid is an instance of power station. [as of 2026-11-24] McCoy Solar Energy Project Hybrid is an instance of solar power station. [2025] McCoy Solar Energy Project Hybrid is owned by McCoy Solar, LLC from 2025. [as of 2026-11-24] McCoy Solar Energy Project Hybrid is operated by McCoy Solar, LLC. [2025] McCoy Solar Energy Project Hybrid had a generating capacity of 500.6 MW on 2025. [as of 2026-11-24] McCoy Solar Energy Project Hybrid is located in Riverside County, California. [as of 2026-11-24] McCoy Solar Energy Project Hybrid is at 33.694722, -114.739722.