[as of 2026-11-24] Mayfield has the identifier eia_plant_id 3917. (current, 0.95, registry) [as of 2026-11-24] Mayfield is an instance of hydroelectric power station. (current, 0.95, registry) [as of 2026-11-24] Mayfield is an instance of power station. (current, 0.95, registry) [2025] Mayfield is owned by City of Tacoma - (WA) from 2025. (current, 0.95, registry) [as of 2026-11-24] Mayfield is operated by City of Tacoma - (WA). (current, 0.95, registry) [2025] Mayfield had a generating capacity of 162.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Mayfield is located in Lewis County, Washington. (current, 0.95, registry) [as of 2026-11-24] Mayfield is at 46.5035, -122.5885. (current, 0.95, registry)