[as of 2026-11-24] Maverick Clean Energy Center (BESS) has the identifier eia_plant_id 69456. [as of 2026-11-24] Maverick Clean Energy Center (BESS) is an instance of battery storage station. [as of 2026-11-24] Maverick Clean Energy Center (BESS) is an instance of power station. [2025] Maverick Clean Energy Center (BESS) is owned by On Energy Storage from 2025. [as of 2026-11-24] Maverick Clean Energy Center (BESS) is operated by On Energy Storage. [2025] Maverick Clean Energy Center (BESS) had a generating capacity of 12.0 MW on 2025. [as of 2026-11-24] Maverick Clean Energy Center (BESS) is located in Brazoria County, Texas. [as of 2026-11-24] Maverick Clean Energy Center (BESS) is at 29.364519, -95.202205.