[as of 2026-11-24] Marengo Wind Plant has the identifier eia_plant_id 56466. (current, 0.95, registry) [as of 2026-11-24] Marengo Wind Plant is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Marengo Wind Plant is an instance of wind farm. (current, 0.95, registry) [2025] Marengo Wind Plant is owned by PacifiCorp from 2025. (current, 0.95, registry) [as of 2026-11-24] Marengo Wind Plant is operated by PacifiCorp. (current, 0.95, registry) [2025] Marengo Wind Plant had a generating capacity of 234.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Marengo Wind Plant is located in Columbia County, Washington. (current, 0.95, registry) [as of 2026-11-24] Marengo Wind Plant is at 46.3747, -117.7772. (current, 0.95, registry)