# Main Canal Headworks

place · `main-canal-headworks` · tier 1 · v1 · updated 2026-11-24

27 MW hydroelectric power station in Grant County, Washington, operated by Columbia Basin Hydropower

## Identifiers
- eia_plant_id: 56698

## Facts
### Current
- Main Canal Headworks is an instance of hydroelectric power station. (current, 0.95, registry) <https://entiti.tech/c/k_80588a476497223b134d4972891176d4@1>
- Main Canal Headworks is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_179e372fdf17f2cb68a934f08e4ecfc5@1>
- Main Canal Headworks is owned by East Columbia Basin Irr Dist (33.3%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_95c04bb75c45874e4bc94bd7c99803bf@1>
- Main Canal Headworks is owned by Quincy-Columbia Basin Irr Dist (33.3%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_b9a35632a59bfacdfad66dadbe7431ee@1>
- Main Canal Headworks is owned by South Columbia Basin Irr Dist (33.3%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_1f58fb199dfb37fa1d9857e4c5c029c6@1>
- Main Canal Headworks is operated by Columbia Basin Hydropower. (current, 0.95, registry) <https://entiti.tech/c/k_131be8bacdb292a9250a30ffd5ed0dd4@1>
- Main Canal Headworks had a generating capacity of 26.8 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_4468e39f3dcb725c2a8f2dbfce769a72@1>
- Main Canal Headworks is located in Grant County, Washington. (current, 0.95, registry) <https://entiti.tech/c/k_423a7d0771f873499b541fee0b335fd5@1>
- Main Canal Headworks is at 47.6164, -119.2992. (current, 0.95, registry) <https://entiti.tech/c/k_b2e5fa6ebe624179d88b7a56d3173857@1>

## Links
- JSON: /e/main-canal-headworks.json · JSON-LD: /e/main-canal-headworks.jsonld · Facts: /e/main-canal-headworks.txt · Feed: /e/main-canal-headworks/feed.xml · Graph: /e/main-canal-headworks/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
