# Louise Solar

place · `louise-solar` · tier 1 · v1 · updated 2026-11-24

50 MW solar power station in Mower County, Minnesota, operated by Geronimo Power

## Identifiers
- eia_plant_id: 67167

## Facts
### Current
- Louise Solar is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_eae931f9ec72e15bb06c9d8858814797@1>
- Louise Solar is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_93714fec6ca383ae3d4f5615950b6702@1>
- Louise Solar is owned by Geronimo Power from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_4e98fdad28cb17cfc6fa8ff994e45859@1>
- Louise Solar is operated by Geronimo Power. (current, 0.95, registry) <https://entiti.tech/c/k_44e719c45028fcf770c8c1056e79ad0a@1>
- Louise Solar had a generating capacity of 50.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_ac145685bead00a1aef0d33b78fee04b@1>
- Louise Solar is located in Mower County, Minnesota. (current, 0.95, registry) <https://entiti.tech/c/k_b8ec8d3df3f1f075d52f889317bab2a5@1>
- Louise Solar is at 43.562, -92.683. (current, 0.95, registry) <https://entiti.tech/c/k_54a133722ebb659adf1b1792aade821e@1>

## Links
- JSON: /e/louise-solar.json · JSON-LD: /e/louise-solar.jsonld · Facts: /e/louise-solar.txt · Feed: /e/louise-solar/feed.xml · Graph: /e/louise-solar/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
