# Lily Solar Hybrid

place · `lily-solar-hybrid` · tier 1 · v1 · updated 2026-11-24

202 MW solar power station in Kaufman County, Texas, operated by Lily Solar, LLC

## Identifiers
- eia_plant_id: 63892

## Facts
### Current
- Lily Solar Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_003d71531c207a8dce2208a4d8617fd1@1>
- Lily Solar Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_4b81b738e03233cda8e8b25ab5ef10cf@1>
- Lily Solar Hybrid is owned by Lily Solar, LLC from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_b2e3cf50faee8286ba1f39ecbc063614@1>
- Lily Solar Hybrid is operated by Lily Solar, LLC. (current, 0.95, registry) <https://entiti.tech/c/k_2986bf04ca37c33bf55bc66b2eab5bd8@1>
- Lily Solar Hybrid had a generating capacity of 201.9 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_739e0b8b84881483e142e263c22b0ca6@1>
- Lily Solar Hybrid is located in Kaufman County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_ea2bb4d5f01d62e10057568339673ed3@1>
- Lily Solar Hybrid is at 32.533273, -96.428985. (current, 0.95, registry) <https://entiti.tech/c/k_eb9bc23a39e1afe03e0c72d547dcdebd@1>

## Links
- JSON: /e/lily-solar-hybrid.json · JSON-LD: /e/lily-solar-hybrid.jsonld · Facts: /e/lily-solar-hybrid.txt · Feed: /e/lily-solar-hybrid/feed.xml · Graph: /e/lily-solar-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
