[as of 2026-11-24] Kayenta Solar Project has the identifier eia_plant_id 61268. (current, 0.95, registry) [as of 2026-11-24] Kayenta Solar Project is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Kayenta Solar Project is an instance of solar power station. (current, 0.95, registry) [2025] Kayenta Solar Project is owned by NGI-Kayenta Solar Lessor I, LLC from 2025. (current, 0.95, registry) [as of 2026-11-24] Kayenta Solar Project is operated by NGI-Kayenta Solar Lessor I, LLC. (current, 0.95, registry) [2025] Kayenta Solar Project had a generating capacity of 55.3 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Kayenta Solar Project is located in Navajo County, Arizona. (current, 0.95, registry) [as of 2026-11-24] Kayenta Solar Project is at 36.771944, -110.263889. (current, 0.95, registry)