# J C McNeil

place · `j-c-mcneil` · tier 1 · v1 · updated 2026-11-24

60 MW biomass power station in Chittenden County, Vermont, operated by City of Burlington Electric - (VT)

## Identifiers
- eia_plant_id: 589

## Facts
### Current
- J C McNeil is an instance of biomass power station. (current, 0.95, registry) <https://entiti.tech/c/k_f7241c5cb6994e5b11db343367bf2123@1>
- J C McNeil is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_0eff6867d20e1840290595b014f2e5c7@1>
- J C McNeil is owned by City of Burlington Electric - (VT) (50.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_f8774df2296c552fd44f70ecc79b9bb7@1>
- J C McNeil is owned by Green Mountain Power Corp (31.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_a26c086cb38809adb03ab002ea5f1c04@1>
- J C McNeil is owned by Vermont Public Power Supply Authority (19.0%) from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_544eb1b639609c79358253a3a948acc3@1>
- J C McNeil is operated by City of Burlington Electric - (VT). (current, 0.95, registry) <https://entiti.tech/c/k_5bdb9d84724684dc69d7f803b50b4ffd@1>
- J C McNeil had a generating capacity of 59.5 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_7f06221f12f2407ffea9f428cc1ceea5@1>
- J C McNeil is located in Chittenden County, Vermont. (current, 0.95, registry) <https://entiti.tech/c/k_30b33e00668a2e2cfa53f4ca72c8ccd4@1>
- J C McNeil is at 44.4917, -73.208056. (current, 0.95, registry) <https://entiti.tech/c/k_d6139ad641b333c76709f21adff6a755@1>

## Links
- JSON: /e/j-c-mcneil.json · JSON-LD: /e/j-c-mcneil.jsonld · Facts: /e/j-c-mcneil.txt · Feed: /e/j-c-mcneil/feed.xml · Graph: /e/j-c-mcneil/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
