[as of 2026-11-24] Intercession City has the identifier eia_plant_id 8049. [as of 2026-11-24] Intercession City has the identifier ghgrp_facility_id 1001188. [as of 2026-11-24] Intercession City is an instance of greenhouse gas reporting facility. [as of 2026-11-24] Intercession City is an instance of natural gas combustion-turbine power station. [as of 2026-11-24] Intercession City is an instance of power station. [2025] Intercession City is owned by Duke Energy Florida, LLC (95.9%) from 2025. [2025] Intercession City is owned by Georgia Power Co (4.1%) from 2025. [2023] Intercession City is owned by Duke Energy (100%) from 2023. [as of 2026-11-24] Intercession City is operated by Duke Energy Florida, LLC. [2025] Intercession City had a generating capacity of 1197.3 MW on 2025. [2023] Intercession City reported 211060 t CO2e of greenhouse gas emissions in 2023. [as of 2026-11-24] Intercession City is located in Osceola County, Florida. [as of 2026-11-24] Intercession City is at 28.262778, -81.548611.