[as of 2026-11-24] Hilltopper Wind Project has the identifier eia_plant_id 61735. [as of 2026-11-24] Hilltopper Wind Project is an instance of power station. [as of 2026-11-24] Hilltopper Wind Project is an instance of wind farm. [2025] Hilltopper Wind Project is owned by Hilltopper Wind Project, LLC from 2025. [as of 2026-11-24] Hilltopper Wind Project is operated by Hilltopper Wind Project, LLC. [2025] Hilltopper Wind Project had a generating capacity of 185.0 MW on 2025. [as of 2026-11-24] Hilltopper Wind Project is located in Logan County, Illinois. [as of 2026-11-24] Hilltopper Wind Project is at 40.03, -89.381.