# Hecate Energy Beacon Solar 3

place · `hecate-energy-beacon-solar-3` · tier 1 · v1 · updated 2026-11-24

56 MW solar power station in Kern County, California, operated by AES Distributed Energy

## Identifiers
- eia_plant_id: 59316

## Facts
### Current
- Hecate Energy Beacon Solar 3 is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_82d4a6757c347834b29fecef85b23230@1>
- Hecate Energy Beacon Solar 3 is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_69cc8155209c5bba06ab3c516719a557@1>
- Hecate Energy Beacon Solar 3 is owned by AES Distributed Energy from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_5026457e32da80719bb317eec2f9c1ac@1>
- Hecate Energy Beacon Solar 3 is operated by AES Distributed Energy. (current, 0.95, registry) <https://entiti.tech/c/k_69d9a75a08f1d716fa817a7abe5b7e08@1>
- Hecate Energy Beacon Solar 3 had a generating capacity of 56.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_12adede6e1ba92c3e72ed1a48b8bbf81@1>
- Hecate Energy Beacon Solar 3 is located in Kern County, California. (current, 0.95, registry) <https://entiti.tech/c/k_e72dd959b8ced8252dacde61b69bbff6@1>
- Hecate Energy Beacon Solar 3 is at 35.253056, -118.014722. (current, 0.95, registry) <https://entiti.tech/c/k_db52344f9778b3adbc69690e671e40e5@1>

## Links
- JSON: /e/hecate-energy-beacon-solar-3.json · JSON-LD: /e/hecate-energy-beacon-solar-3.jsonld · Facts: /e/hecate-energy-beacon-solar-3.txt · Feed: /e/hecate-energy-beacon-solar-3/feed.xml · Graph: /e/hecate-energy-beacon-solar-3/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
