[as of 2026-11-24] Grand Meadow (wind farm) has the identifier eia_plant_id 56994. (current, 0.95, registry) [as of 2026-11-24] Grand Meadow (wind farm) is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Grand Meadow (wind farm) is an instance of wind farm. (current, 0.95, registry) [2025] Grand Meadow (wind farm) is owned by Northern States Power Co - Minnesota from 2025. (current, 0.95, registry) [as of 2026-11-24] Grand Meadow (wind farm) is operated by Northern States Power Co - Minnesota. (current, 0.95, registry) [2025] Grand Meadow (wind farm) had a generating capacity of 100.5 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Grand Meadow (wind farm) is located in Mower County, Minnesota. (current, 0.95, registry) [as of 2026-11-24] Grand Meadow (wind farm) is at 43.7189, -92.705. (current, 0.95, registry)