# Ganado Solar

place · `ganado-solar` · tier 1 · v1 · updated 2026-11-24

221 MW solar power station in Jackson County, Texas, operated by Enel Green Power NA, Inc.

## Identifiers
- eia_plant_id: 67284

## Facts
### Current
- Ganado Solar is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_5dbd1850be62777980cc7feba7e8c7a8@1>
- Ganado Solar is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_0ed74b9e6283ea7574737f6f06eb8b92@1>
- Ganado Solar is owned by Enel Green Power NA, Inc. from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_4565720fde49fb483291b5042b6c1592@1>
- Ganado Solar is operated by Enel Green Power NA, Inc.. (current, 0.95, registry) <https://entiti.tech/c/k_1887965992d4210735b6c056d1781991@1>
- Ganado Solar had a generating capacity of 221.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_d355faaf0cbf44a22371712fbd726917@1>
- Ganado Solar is located in Jackson County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_139ebde4f45ec447167cfd3941acb78b@1>
- Ganado Solar is at 29.109147, -96.528761. (current, 0.95, registry) <https://entiti.tech/c/k_ea1498b645d420f9f0e2163ec2f1b59a@1>

## Links
- JSON: /e/ganado-solar.json · JSON-LD: /e/ganado-solar.jsonld · Facts: /e/ganado-solar.txt · Feed: /e/ganado-solar/feed.xml · Graph: /e/ganado-solar/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
