[as of 2026-11-24] Fort Green Solar Power Plant has the identifier eia_plant_id 64533. [as of 2026-11-24] Fort Green Solar Power Plant is an instance of power station. [as of 2026-11-24] Fort Green Solar Power Plant is an instance of solar power station. [2025] Fort Green Solar Power Plant is owned by Duke Energy Florida, LLC from 2025. [as of 2026-11-24] Fort Green Solar Power Plant is operated by Duke Energy Florida, LLC. [2025] Fort Green Solar Power Plant had a generating capacity of 74.9 MW on 2025. [as of 2026-11-24] Fort Green Solar Power Plant is located in Hardee County, Florida. [as of 2026-11-24] Fort Green Solar Power Plant is at 27.641125, -81.941581.