228 MW solar power station in Fort Bend County, Texas, operated by AP Solar 2, LLC

## Identifiers
- eia_plant_id: 62945

## Facts
### Current
- Fighting Jays Solar Project is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_71c136df4547a5f86e41f2581fd325d9@1>
- Fighting Jays Solar Project is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_b46a6291cff0e589844e96d5c058acbd@1>
- Fighting Jays Solar Project is owned by AP Solar 2, LLC from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_a85d41c2f7a09d70cbd8a18389c4d239@1>
- Fighting Jays Solar Project is operated by AP Solar 2, LLC. (current, 0.95, registry) <https://entiti.tech/c/k_9e28a2756167f8c2ad90f270a06294e3@1>
- Fighting Jays Solar Project had a generating capacity of 227.5 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_13db05db4541bf9afcdcb163225e26a2@1>
- Fighting Jays Solar Project is located in Fort Bend County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_87e36704bb077ae83d481e2f6dcf39a3@1>
- Fighting Jays Solar Project is at 29.358425, -95.746388. (current, 0.95, registry) <https://entiti.tech/c/k_3f8ace1bd71dcf0a4f0864d129402db4@1>