[as of 2026-11-24] El Centro Hybrid has the identifier eia_plant_id 389. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid has the identifier ghgrp_facility_id 1001454. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is an instance of greenhouse gas reporting facility. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is an instance of natural gas combined-cycle power station. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is an instance of power station. (current, 0.95, registry) [2025] El Centro Hybrid is owned by Imperial Irrigation District from 2025. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is operated by Imperial Irrigation District. (current, 0.95, registry) [2025] El Centro Hybrid had a generating capacity of 388.3 MW on 2025. (current, 0.95, registry) [2023] El Centro Hybrid reported 510179 t CO2e of greenhouse gas emissions in 2023. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is located in Imperial County, California. (current, 0.95, registry) [as of 2026-11-24] El Centro Hybrid is at 32.802222, -115.54. (current, 0.95, registry)