# El Centro Hybrid

place · `el-centro-hybrid` · tier 1 · v1 · updated 2026-11-24

388 MW natural gas combined-cycle power station in Imperial County, California, operated by Imperial Irrigation District

## Identifiers
- eia_plant_id: 389

## Facts
### Current
- El Centro Hybrid is an instance of natural gas combined-cycle power station. (current, 0.95, registry) <https://entiti.tech/c/k_c790f8582e112d08532385b6f34bfeb8@1>
- El Centro Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_68420ecb54da76742cd03007219c4568@1>
- El Centro Hybrid is owned by Imperial Irrigation District from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_b0535b4a9bbe12b2581ca9ae5e72efbd@1>
- El Centro Hybrid is operated by Imperial Irrigation District. (current, 0.95, registry) <https://entiti.tech/c/k_1d2f5dcf7b7437a05bd39f12850410ca@1>
- El Centro Hybrid had a generating capacity of 388.3 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_922d366ef2a14bc18d21abb2e0b44e80@1>
- El Centro Hybrid is located in Imperial County, California. (current, 0.95, registry) <https://entiti.tech/c/k_aa10bae98f169178fd2fe1894e982e16@1>
- El Centro Hybrid is at 32.802222, -115.54. (current, 0.95, registry) <https://entiti.tech/c/k_d6621fb1bc771bf39f269cdc5a0596c2@1>

## Links
- JSON: /e/el-centro-hybrid.json · JSON-LD: /e/el-centro-hybrid.jsonld · Facts: /e/el-centro-hybrid.txt · Feed: /e/el-centro-hybrid/feed.xml · Graph: /e/el-centro-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
