[as of 2026-11-24] East Blackland Solar Project 1 has the identifier eia_plant_id 57659. (current, 0.95, registry) [as of 2026-11-24] East Blackland Solar Project 1 is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] East Blackland Solar Project 1 is an instance of solar power station. (current, 0.95, registry) [2025] East Blackland Solar Project 1 is owned by Deriva Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] East Blackland Solar Project 1 is operated by Deriva Energy. (current, 0.95, registry) [2025] East Blackland Solar Project 1 had a generating capacity of 144.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] East Blackland Solar Project 1 is located in Travis County, Texas. (current, 0.95, registry) [as of 2026-11-24] East Blackland Solar Project 1 is at 30.4214, -97.4614. (current, 0.95, registry)