[as of 2026-11-24] Crocker Wind Farm has the identifier eia_plant_id 60505. [as of 2026-11-24] Crocker Wind Farm is an instance of power station. [as of 2026-11-24] Crocker Wind Farm is an instance of wind farm. [2025] Crocker Wind Farm is owned by Geronimo Power from 2025. [as of 2026-11-24] Crocker Wind Farm is operated by Geronimo Power. [2025] Crocker Wind Farm had a generating capacity of 200.0 MW on 2025. [as of 2026-11-24] Crocker Wind Farm is located in Clark County, South Dakota. [as of 2026-11-24] Crocker Wind Farm is at 45.051544, -97.826423.