[as of 2026-11-24] Cotton Center Solar Hybrid has the identifier eia_plant_id 57561. [as of 2026-11-24] Cotton Center Solar Hybrid is an instance of battery storage station. [as of 2026-11-24] Cotton Center Solar Hybrid is an instance of power station. [2025] Cotton Center Solar Hybrid is owned by Arizona Public Service Co from 2025. [as of 2026-11-24] Cotton Center Solar Hybrid is operated by Arizona Public Service Co. [2025] Cotton Center Solar Hybrid had a generating capacity of 34.0 MW on 2025. [as of 2026-11-24] Cotton Center Solar Hybrid is located in Maricopa County, Arizona. [as of 2026-11-24] Cotton Center Solar Hybrid is at 33.034722, -112.661667.