[as of 2026-11-24] Copper Mountain Solar 2 has the identifier eia_plant_id 58017. [as of 2026-11-24] Copper Mountain Solar 2 is an instance of power station. [as of 2026-11-24] Copper Mountain Solar 2 is an instance of solar power station. [2025] Copper Mountain Solar 2 is owned by RWE Clean Energy from 2025. [as of 2026-11-24] Copper Mountain Solar 2 is operated by RWE Clean Energy. [2025] Copper Mountain Solar 2 had a generating capacity of 154.0 MW on 2025. [as of 2026-11-24] Copper Mountain Solar 2 is located in Clark County, Nevada. [as of 2026-11-24] Copper Mountain Solar 2 is at 35.786389, -114.962778.