[as of 2026-11-24] Copper Mountain Solar 2 has the identifier eia_plant_id 58017. (current, 0.95, registry) [as of 2026-11-24] Copper Mountain Solar 2 is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Copper Mountain Solar 2 is an instance of solar power station. (current, 0.95, registry) [2025] Copper Mountain Solar 2 is owned by RWE Clean Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] Copper Mountain Solar 2 is operated by RWE Clean Energy. (current, 0.95, registry) [2025] Copper Mountain Solar 2 had a generating capacity of 154.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Copper Mountain Solar 2 is located in Clark County, Nevada. (current, 0.95, registry) [as of 2026-11-24] Copper Mountain Solar 2 is at 35.786389, -114.962778. (current, 0.95, registry)