[as of 2026-11-24] Clearwater Wind II has the identifier eia_plant_id 66184. [as of 2026-11-24] Clearwater Wind II is an instance of power station. [as of 2026-11-24] Clearwater Wind II is an instance of wind farm. [2025] Clearwater Wind II is owned by Clearwater Wind II, LLC from 2025. [as of 2026-11-24] Clearwater Wind II is operated by Clearwater Wind II, LLC. [2025] Clearwater Wind II had a generating capacity of 102.8 MW on 2025. [as of 2026-11-24] Clearwater Wind II is located in Rosebud County, Montana. [as of 2026-11-24] Clearwater Wind II is at 46.818828, -106.194583.