[as of 2026-11-24] Citrus Solar Energy Center Hybrid has the identifier eia_plant_id 60061. (current, 0.95, registry) [as of 2026-11-24] Citrus Solar Energy Center Hybrid is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Citrus Solar Energy Center Hybrid is an instance of solar power station. (current, 0.95, registry) [2025] Citrus Solar Energy Center Hybrid is owned by Florida Power & Light Co from 2025. (current, 0.95, registry) [as of 2026-11-24] Citrus Solar Energy Center Hybrid is operated by Florida Power & Light Co. (current, 0.95, registry) [2025] Citrus Solar Energy Center Hybrid had a generating capacity of 78.5 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Citrus Solar Energy Center Hybrid is located in DeSoto County, Florida. (current, 0.95, registry) [as of 2026-11-24] Citrus Solar Energy Center Hybrid is at 27.320919, -81.806863. (current, 0.95, registry)