# Citrus Solar Energy Center Hybrid

place · `citrus-solar-energy-center-hybrid` · tier 1 · v1 · updated 2026-11-24

78 MW solar power station in DeSoto County, Florida, operated by Florida Power & Light Co

## Identifiers
- eia_plant_id: 60061

## Facts
### Current
- Citrus Solar Energy Center Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_a444048f74a382946b731e35408d73c5@1>
- Citrus Solar Energy Center Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_cafe1c64ef89ed592467b82ab7371fdf@1>
- Citrus Solar Energy Center Hybrid is owned by Florida Power & Light Co from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_abfe0326356e481136e57b4c5d28ee6c@1>
- Citrus Solar Energy Center Hybrid is operated by Florida Power & Light Co. (current, 0.95, registry) <https://entiti.tech/c/k_6b76d08a76fd05ffb36eed3b8210c355@1>
- Citrus Solar Energy Center Hybrid had a generating capacity of 78.5 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_841f388bdedaabe48592c065c520a446@1>
- Citrus Solar Energy Center Hybrid is located in DeSoto County, Florida. (current, 0.95, registry) <https://entiti.tech/c/k_6cc3e2ed6442f3348c1c892282d54206@1>
- Citrus Solar Energy Center Hybrid is at 27.320919, -81.806863. (current, 0.95, registry) <https://entiti.tech/c/k_eb73041813ba04f55088533a0650aabe@1>

## Links
- JSON: /e/citrus-solar-energy-center-hybrid.json · JSON-LD: /e/citrus-solar-energy-center-hybrid.jsonld · Facts: /e/citrus-solar-energy-center-hybrid.txt · Feed: /e/citrus-solar-energy-center-hybrid/feed.xml · Graph: /e/citrus-solar-energy-center-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
