[as of 2026-11-24] Cimarron Windpower II has the identifier eia_plant_id 57663. [as of 2026-11-24] Cimarron Windpower II is an instance of power station. [as of 2026-11-24] Cimarron Windpower II is an instance of wind farm. [2025] Cimarron Windpower II is owned by DEGS Wind 1 LLC (50.0%) from 2025. [2025] Cimarron Windpower II is owned by Sumitomo Corporation of America (50.0%) from 2025. [as of 2026-11-24] Cimarron Windpower II is operated by Deriva Energy. [2025] Cimarron Windpower II had a generating capacity of 131.0 MW on 2025. [as of 2026-11-24] Cimarron Windpower II is located in Gray County, Kansas. [as of 2026-11-24] Cimarron Windpower II is at 37.90133, -100.372.