[as of 2026-11-24] Chickasaw Wind Farm has the identifier eia_plant_id 66668. (current, 0.95, registry) [as of 2026-11-24] Chickasaw Wind Farm is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Chickasaw Wind Farm is an instance of wind farm. (current, 0.95, registry) [2025] Chickasaw Wind Farm is owned by MidAmerican Energy Co from 2025. (current, 0.95, registry) [as of 2026-11-24] Chickasaw Wind Farm is operated by MidAmerican Energy Co. (current, 0.95, registry) [2025] Chickasaw Wind Farm had a generating capacity of 202.4 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Chickasaw Wind Farm is located in Chickasaw County, Iowa. (current, 0.95, registry) [as of 2026-11-24] Chickasaw Wind Farm is at 43.14014, -92.32443. (current, 0.95, registry)