# Chandler

place · `chandler` · tier 1 · v1 · updated 2026-11-24

12 MW hydroelectric power station in Benton County, Washington, operated by U S Bureau of Reclamation

## Identifiers
- eia_plant_id: 6406

## Facts
### Current
- Chandler is an instance of hydroelectric power station. (current, 0.95, registry) <https://entiti.tech/c/k_f3df8f60d9b4100963a55f82fe17bf66@1>
- Chandler is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_05267d3db0461387afa5b04a414d08d4@1>
- Chandler is owned by U S Bureau of Reclamation from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_03fb7d8625bf2f3499c488368186c2cf@1>
- Chandler is operated by U S Bureau of Reclamation. (current, 0.95, registry) <https://entiti.tech/c/k_0faba3070ac5cae2d2a44ed45ee9b090@1>
- Chandler had a generating capacity of 12.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_c76a44997320eb7debdec760719278e3@1>
- Chandler is located in Benton County, Washington. (current, 0.95, registry) <https://entiti.tech/c/k_c517317a7b7e8c13bc52ad485e2a815e@1>
- Chandler is at 46.26678, -119.589821. (current, 0.95, registry) <https://entiti.tech/c/k_50388f52ae4f27086bff74aede729713@1>

## Links
- JSON: /e/chandler.json · JSON-LD: /e/chandler.jsonld · Facts: /e/chandler.txt · Feed: /e/chandler/feed.xml · Graph: /e/chandler/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
