[as of 2026-11-24] Cedar Point Wind has the identifier eia_plant_id 57315. (current, 0.95, registry) [as of 2026-11-24] Cedar Point Wind is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Cedar Point Wind is an instance of wind farm. (current, 0.95, registry) [2025] Cedar Point Wind is owned by Cedar Point LLC (51.0%) from 2025. (current, 0.95, registry) [2025] Cedar Point Wind is owned by Clover US Blocker LLC (49.0%) from 2025. (current, 0.95, registry) [as of 2026-11-24] Cedar Point Wind is operated by Cedar Point LLC. (current, 0.95, registry) [2025] Cedar Point Wind had a generating capacity of 252.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Cedar Point Wind is located in Lincoln County, Colorado. (current, 0.95, registry) [as of 2026-11-24] Cedar Point Wind is at 39.421787, -103.67814. (current, 0.95, registry)